SCHENECTADY, N.Y. (April 26, 2023) – DSD Renewables (DSD) and Black Bear Energy have completed the construction of two onsite rooftop solar systems totaling 554 kW at the Signature Center office buildings in Pleasanton, California. The buildings are owned by an account managed by Principal Asset Management, through its dedicated real estate investment team.
The 282 kW and 272 kW solar systems were installed behind the meter and will serve a large portion of the buildings’ electricity needs. The rooftop projects are expected to collectively produce 940 MWh of clean energy per year, the equivalent of powering 130 homes or avoiding 734 tons of CO2 emitted per year.